****点击查看涉及沪昆线改线及沪昆高铁桥墩加固工程项目经理部询价采购补遗公告
各潜在供应商:
****点击查看涉及沪昆线改线及沪昆高铁桥墩加固工程项目经理部****点击查看声测管材料采购询价文件(询价编号:****点击查看)进行第一次补遗说明,内容如下:
声测管尺寸明细
桩的根数 | 桩长(m) | 型号 | 底管(根) | 每根底管长m | 底管总长m | 中管(根) | 每根中管长m | 中管总长m | 顶管(根) | 每根顶管长m | 顶管总长m |
8 | 18 | Φ50*3mm钢管 | 32 | 12 | 384 | 32 | 6.95 | 222.4 | 0 | 0 | 0 |
3 | 15 | Φ40mm无损检测金属管 | 9 | 12 | 108 | 9 | 3.95 | 35.55 | 0 | 0 | 0 |
1 | 16 | 3 | 12 | 36 | 3 | 4.95 | 14.85 | 0 | 0 | 0 | |
5 | 19 | 15 | 12 | 180 | 15 | 7.95 | 119.25 | 0 | 0 | 0 | |
7 | 20 | 21 | 12 | 252 | 21 | 8.95 | 187.95 | 0 | 0 | 0 | |
4 | 18 | 12 | 12 | 144 | 12 | 6.95 | 83.4 | 0 | 0 | 0 | |
4 | 15 | Φ40mm无损检测金属管 | 16 | 12 | 192 | 16 | 3.95 | 63.2 | 0 | 0 | 0 |
1 | 14 | 4 | 12 | 48 | 4 | 2.95 | 11.8 | 0 | 0 | 0 | |
1 | 13 | 4 | 12 | 48 | 4 | 1.95 | 7.8 | 0 | 0 | 0 | |
1 | 9 | 4 | 9.95 | 39.8 | 0 | 0 | 0 | 0 | 0 | 0 | |
3 | 18 | 12 | 12 | 144 | 12 | 6.95 | 83.4 | 0 | 0 | 0 | |
2 | 19 | 8 | 12 | 96 | 8 | 7.95 | 63.6 | 0 | 0 | 0 | |
4 | 20 | 16 | 12 | 192 | 16 | 8.95 | 143.2 | 0 | 0 | 0 | |
3 | 21 | 12 | 12 | 144 | 12 | 9.95 | 119.4 | 0 | 0 | 0 | |
3 | 22 | 12 | 12 | 144 | 12 | 10.95 | 131.4 | 0 | 0 | 0 | |
2 | 23 | 8 | 12 | 96 | 8 | 11.95 | 95.6 | 0 | 0 | 0 | |
2 | 24 | 8 | 12 | 96 | 8 | 12 | 96 | 8 | 0.95 | 7.6 | |
2 | 25 | 8 | 12 | 96 | 8 | 12 | 96 | 8 | 1.95 | 15.6 | |
2 | 17 | 8 | 12 | 96 | 8 | 5.95 | 47.6 | 0 | 0 | 0 | |
1 | 16 | 4 | 12 | 48 | 4 | 4.95 | 19.8 | 0 | 0 | 0 | |
1 | 15 | 4 | 12 | 48 | 4 | 3.95 | 15.8 | 0 | 0 | 0 | |
2 | 18 | 8 | 12 | 96 | 8 | 6.95 | 55.6 | 0 | 0 | 0 | |
1 | 19 | 4 | 12 | 48 | 4 | 7.95 | 31.8 | 0 | 0 | 0 | |
1 | 20 | 4 | 12 | 48 | 4 | 8.95 | 35.8 | 0 | 0 | 0 | |
1 | 21 | 4 | 12 | 48 | 4 | 9.95 | 39.8 | 0 | 0 | 0 | |
4 | 17 | 16 | 12 | 192 | 16 | 5.95 | 95.2 | 0 | 0 | 0 | |
4 | 18 | 16 | 12 | 192 | 16 | 6.95 | 111.2 | 0 | 0 | 0 | |
1 | 11 | 4 | 11.95 | 47.8 | 0 | 0 | 0 | 0 | 0 | 0 | |
4 | 13 | 16 | 12 | 192 | 16 | 1.95 | 31.2 | 0 | 0 | 0 | |
3 | 14 | 12 | 12 | 144 | 12 | 2.95 | 35.4 | 0 | 0 | 0 | |
6 | 15 | 24 | 12 | 288 | 24 | 3.95 | 94.8 | 0 | 0 | 0 | |
2 | 12 | 8 | 12 | 96 | 0 | 0 | 0 | 0 | 0 | 0 | |
3 | 16 | 12 | 12 | 144 | 12 | 4.95 | 59.4 | 0 | 0 | 0 | |
3 | 18 | 12 | 12 | 144 | 12 | 6.95 | 83.4 | 0 | 0 | 0 | |
1 | 17 | 4 | 12 | 48 | 4 | 5.95 | 23.8 | 0 | 0 | 0 | |
3 | 16 | 12 | 12 | 144 | 12 | 4.95 | 59.4 | 0 | 0 | 0 | |
3 | 15 | 12 | 12 | 144 | 12 | 3.95 | 47.4 | 0 | 0 | 0 | |
2 | 18 | 8 | 12 | 96 | 8 | 6.95 | 55.6 | 0 | 0 | 0 | |
2 | 17 | 8 | 12 | 96 | 8 | 5.95 | 47.6 | 0 | 0 | 0 | |
4 | 20 | 16 | 12 | 192 | 16 | 8.95 | 143.2 | 0 | 0 | 0 | |
2 | 14 | 8 | 12 | 96 | 8 | 2.95 | 23.6 | 0 | 0 | 0 | |
5 | 24 | 20 | 12 | 240 | 20 | 12 | 240 | 20 | 0.95 | 19 | |
3 | 22 | 12 | 12 | 144 | 12 | 10.95 | 131.4 | 0 | 0 | 0 | |
428 | 5127.6 | 412 | 2881.2 | 36 | 42.2 |
采购人名称:****点击查看涉及沪昆线改线及沪昆高铁桥墩加固工程项目经理部
地址:**省**市马场坪鱼酉村
联系人:陈灿 联系电话:173****点击查看6617
****点击查看集团有限公司
****点击查看管理中心****点击查看中心
2025年7月11日